Industrial waste crushers can be standalone equipment. Of course, you can connect it with a feeding conveyor, or with other shredding and baling machines to compose a production line. Some heavy-duty industrial waste grinders with high output are commonly popular in recycling lines. They are mostly placed behind the shredders as a secondary size reduction process to obtain smaller and uniform-sized pieces.


6 major considerations of industrial waste crusher machine:

First, the industrial waste crusher and the power unit must be firmly installed. If the industrial waste crusher is required to fix it, it should be fixed on the cement; if the industrial waste crusher flow operation, the unit should be installed on the base made of angle iron, and ensure the power machine (diesel or electric motor) and plastic The belt wheel trough of the crusher is in the same turning plane.

industrial waste crusher, waste crusher machine, industrial crusher, mini plastic shredder, plastic crusher machine for sale

Second, the industrial waste crusher is installed after installation, and it is necessary to check the fastening of the fasteners. If there is loose to give it to tighten. At the same time, check if the leather belt looseness is appropriate.

Third, before the plastic crusher starts, first turn the rotor, check if the jug, the hammer and the rotor are flexible and reliable, there is no collision in the broken room, whether the rotation direction of the rotor is consistent with the direction of the arrow, the power machine and Whether the plastic crusher is lubricated.

Fourth, don't just replace the pulley, to prevent the break stream to produce an explosion, or the speed is too low to affect the working efficiency of the pulverizer.

Five. After the industrial waste crusher starts, it should be kept for 2 to 3 minutes, no abnormal phenomenon, then press the work.

Six. At any time, you should pay attention to the operation of the industrial waste crusher, first of all, the feeding should be uniform to prevent blockage of the crushed material; second, don't have a long time overload. If there is found that vibration, noise, the bearing and the body temperature are too high, the outer spray, etc., should be closed immediately, and the fault can be eliminated.